The lead government T&E engineer is responsible for the CTP process and the Chief Engineer or Technical Director is responsible for defining the CTPs.

See Defense Acquisition Guidebook (DAG) - Chapter 9.3.3

User Avatar

Wiki User

12y ago
This answer is:
User Avatar
More answers
User Avatar

Anonymous

Lvl 1
3y ago

False. "the Chief Engineer or Technical Director is responsible for defining the CTPs." Defense Acquisition Guide

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: The independent operational test and evaluation agency is responsible for the establishment of Critical Technical Parameters (CTPs).?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Is the independent operational Test and evaluation agency responsible for the establishment of Critical Technical Parameters?

False. "the Chief Engineer or Technical Director is responsible for defining the CTPs." Defense Acquisition Guide


H -parameters of an operational Amplifier?

hie


What would operational testers use to determine whether a system meets operational performance parameters?

Measures of Effectiveness (MOEs)


What is operational pressure?

Operational pressure refers to the pressure required for a system or device to function effectively within its specified parameters. It is important to ensure that the operational pressure is correctly maintained to prevent issues such as leaks or malfunctions.


What would operational testers use to assess whether a system meets usability reliability and maintainability parameters?

Measures of Suitability (MOSs) are specific, objective measures of how well as system can be maintained and utilized by the end user. They are written and approved by an independent operational test agency. An example of a MOS is: "Aircraft Mean Time Between Failure (MTBF)."


Why hybrid parameters are so called?

Hybrid parameters are called so, because the parameters have different units. In Z- parameters, all the parameters have units of ohms and in Y- parameters, all parameters have Siemens as units. But in hybrid parameters, we have both ohms and Siemens as units. The other way it is called hybrid is, the independent variables are the input current and output voltage.


Why hybrid parameters are called hybrid?

Hybrid parameters are called so, because the parameters have different units. In Z- parameters, all the parameters have units of ohms and in Y- parameters, all parameters have Siemens as units. But in hybrid parameters, we have both ohms and Siemens as units. The other way it is called hybrid is, the independent variables are the input current and output voltage.


If you increase the length of a rectangle does this increase the width?

absolutely no. length and width are independent parameters .


What has the author Ahmad Na'im Khayyat written?

Ahmad Na'im Khayyat has written: 'The influence of design and operational parameters on microniser performance'


What has the author C D Harle written?

C. D. Harle has written: 'Establishment of design parameters for large slab type ingot moulds'


The prime source of testable parameters for operational test and evaluation is the?

Per Lesson 18 of DAU ACQ101Capability Development Document (CDD)The CDD is a formatted document that provides operational performance parameters necessary to design a proposed system. The CDD builds on the Initial Capabilities Document (ICD) and must be approved prior to Milestone B.The CDD documents the user's operational performance capabilities in terms of thresholds (minimum acceptable value) and objectives. It also provides system-specific requirements such as:l Rangel Speed of data transmissionl Reliability


Why z parameters are called open circuit impedance?

In the Z-parameter Equations the independent parameters are Currents i.e., i/p And O/p . therefore to find any of the parameter(Z11,Z12,Z21,Z22) We have to either open circuit the input or the output port .as we are open circuiting any one of the port the Z-parameters Are called as open circuit parameters Got It ! Clear!