answersLogoWhite

0


Best Answer

jesus monkey says to fist yourself......time now get on it you f@#k....

User Avatar

Wiki User

11y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

11y ago

Security

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What site placement criterion can compromise the operation?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about U.S. History

When was Chimney Rock National Historic Site created?

Chimney Rock State Park was founded in 2007. The land was privately owned from 1902 to 2007; in 2006 the land was put up for sale. North Carolina Department of Environment and Natural Resources took over its operation as a State Park when the government purchased the property.


When would you consider accropodes to armour a rubble mound breakwater?

Accopodes are preferred when: i) armour stone quarrying is difficult to get bigger stones weighing more than 12t involving loading,at quarry site, transportation, unloading at project site for stacking all using heavy duty crane and then again transporting for placement abd placing whereas this simplified to mere casting at site and transportation to site for placement ii) Bye products of lesser stones will be over 50% iii) Design wave height(Hs) is more 3m/10 to 12 sec iv) For larger wave heights this is cheaper construction but you have to pay royalty to Sogreah still. v) Better interlocking property in accropode vi) You can have steeper slope beter than rubblemound meaning lesser quantity vii) Once placed it is stable by and large and no replacement viii) Better stabity and damage coeffcients for use Hudsons or Van der Meer formula ix) Single layer -fairly easy for construction x) Accropode II is still better-lesser concrete quantity an more friction capacity and good capacity to withstand worst wave climate xi) For lesser depths and reasonably moderate climates rubblemound is still better bcz placement does not require high skills where as it in accropodes this is must and sogreah will sit on your neck on the quality and interlocking necessity There are many more-i would stop here -i ahave an appointmeny k.dharmalingam port planning consultant Chennai, Tamailnadu India


What is site plan?

A Site Plan is a drawing that depicts the site of a proposed or existing project.


Where was the first large-scale nuclear test site in the us?

The Pacific Test Range starting with Bikini Atoll in 1946 with Operation Crossroads. It eventually expanded to encompass Eniwetok Atoll, Johnston Island, and several other Islands and Atolls. The largest device tested was the Castle Bravo shot in 1954 at 15 Mtons. The Nevada Test Site north of Las Vegas started in 1951 as the official continental test site with Operation Ranger. The largest device tested was the Plumbob Pricilla shot in 1957 at 78 Ktons. The Plumbob series also included a failed underground "safety test" that launched its 4 inch thick steel "manhole cover" at a speed documented at greater than escape velocity, making it the first manmade object to launch from the earth's surface at greater than escape velocity (although it definitely melted from friction before leaving the atmosphere and fell back).


Why did the English Settlers choose the site of Henricus?

because it was next to the site of Jamestown

Related questions

What site placement criterion considers while rehearsing a well placed observer can compromise the entire operation?

This criterion is known as security.


While rehearsing observer can compromise the entire operation which site placement criterion considers this concern?

A well placed observer can compromise the entire operation is security. The site must be secure from attack and from observation.


Which site placement criterion considers this concern?

Security


What site placement in a rehearsal can compromise the entire operation?

Placing a critical equipment or instrument in a location with poor visibility or difficult access can compromise the entire operation of a rehearsal. It can lead to delays, confusion, or even accidents if performers or technicians cannot properly see or reach the necessary items. Additionally, placing important equipment in an area prone to interference or distractions can also compromise the effectiveness of the rehearsal.


Is NOT a rehearsal site selection criterion?

weather


What is a signal site criterion?

Selecting a signaling site and putting your signal in a suitable location is critical. A signaling site is defined as any site, based on your situation that enhances signaling efforts and the likelihood for the signal to be detected by friendly forces. What is a signaling site criterion?


What is the most important criterion inrehearsal site selection?

weather


What is the most important criterion in site selection?

The site must be right for the selected rehearsal type.


What is the most important criterion in rehearsal site?

The site must be right for the selected rehearsal type.


What the most important criterion in rehearsal site selection?

The site must be right for the selected rehearsal type.


What is the most important criterion in selecting rehearsal site?

The site must be right for the selected rehearsal type.


What is Most important criterion in rehearsal site selection?

The site must be right for the selected rehearsal type.